Please wait...loading

Project Name

Bossa II Tekstil Fabrika, 2007

Client

Sabancı Holding Bossa Tekstil A.Ş.

Location

Yüreğir, Adana / Turkey

Contract

Turn-Key

Total Area Developed

120,000 m2

Total Building Area

58,500 m2

Construction Techniques

Medabil VP High Strength Structural Steel System
Regular Strength Local Steel System
Prefabricated Building System
Standing Seam Roof
Natural Ventilation Systems
Reinforced Concrete
Infrastructure
Refurbishing of Existing Buildings
Roads

 

Location

« Back

close